Artemis III SLS Core Stage Joins Boosters at Kennedy

NASA’s Artemis III SLS (Space Launch System) core stage is integrated alongside the twin solid rocket boosters on Oct. 28 inside the Vehicle Assembly Building’s High Bay 3 at NASA’s Kennedy Space Center in Florida.   Technicians lifted the 212-foot rocket stage from the facility’s High Bay 2 using a one-of-a kind lifting beam designed […]

October 28, 2026 at 05:30AM
from NASA https://ift.tt/aShxqY8

Post a Comment

Previous Post Next Post