Curiosity Blog, Sols 4709-4715: Drilling High and Low in the Boxwork Unit

Written by Catherine O’Connell-Cooper, APXS Strategic Planner and Payload Uplink/Downlink Lead, University of New Brunswick, Canada Earth planning date: Friday, Nov. 7, 2025 We are in the most intensive phase of the boxwork structures investigation — the drill campaign. The boxwork campaign group requested a pair of drilled targets — one in a hollow (the […]

November 18, 2025
from NASA https://ift.tt/wluhcQN

Post a Comment

Previous Post Next Post